Avatar

Hon'ble PM
Shri Narendra Modi

Avatar

Hon'ble MoC
Shri Jyotiraditya M Scindia

Avatar

Hon'ble MoS
Dr.Pemmasani Chandra Sekhar

  • SNo. Title File Date
    1 Calling of applications from Interns willing to join in Q4-2026 (Oct-26 to Dec-26) in NCCS, Bengaluru as per ‘NCCS Internship Scheme’ Download (pdf) (672.89KB) pdf
    2 Notice for stakeholder consultation on “Draft for Comments – Test Cases for Unified Data Repository (UDR) of 5G Download (pdf) (423.29KB) pdf
    3 Notice for stakeholder consultation on “Draft for Comments – Test Cases for Binding Support Function (BSF) of 5G Download (pdf) (425.98KB) pdf
    4 Notice for stakeholder consultation on “Draft for Comments – Test Cases for Unstructured Data Storage Function (UDSF) of 5G Download (pdf) (429.78KB) pdf
    5 Notice for stakeholder consultation on “Draft for Comments – Test Cases for Short Message Service Function (SMSF) of 5G Download (pdf) (429.44KB) pdf
    6 Notice for stakeholder consultation on “Draft for Comments – Test Cases for Network Slice Admission Control Function (NSACF) of 5G Download (pdf) (431.63KB) pdf
    7 NCCS has designated M/s Intelecyber Services Pvt. Ltd. as Telecom Security Testing Laboratory (TSTL) in India w.e.f. date 18-Aug-2026, for conducting the conformity assessment of security requirements for Telecom equipments viz. Wi-Fi CPE version 2.0.0. Download (pdf) (638.37KB) pdf
    8 NCCS has designated M/s Intelecyber Services Pvt. Ltd. as Telecom Security Testing Laboratory (TSTL) in India w.e.f. date 14-Aug-2026, for conducting the conformity assessment of security requirements for Telecom equipments viz. IP Router version 2.0.0. Download (pdf) (615.48KB) pdf
    9 Exemption of Cloud implemented IP Routers and Wi-Fi CPEs from Security Certification – Reg. Download (pdf) (539.23KB) pdf
    10 NCCS has designated M/s Deltaphi Labs Pvt. Ltd. as Telecom Security Testing Laboratory (TSTL) in India w.e.f. date 13-Aug-2026, for conducting the conformity assessment of security requirements for Telecom equipments viz. L2/L3 Switch & Next Generation Firewall including IDS & IPS. Download (pdf) (654.61KB) pdf
  • SNo. Title File Last Date Of Submission Of Comments/Inputs Date And Timing Of Meeting
  • SNo. Title File Date Of Publish Last Date Of Submission Of Bid
  • SNo. Title File Date