nccs-portal

Latest Updates

SNo. Title File Date
41 NCCS withdraws the TSTL Designation granted to M/s TUV Rheinland (India) Pvt Ltd., Bengaluru (Certificate No. NCCS/SLR/04) with immediate effect. Download (pdf) (378.13KB) pdf 02-04-2025
42 NCCS has provisionally designated M/s IITM Pravartak Technologies Foundation as Telecom Security Testing Laboratory(TSTL) in India w.e.f date 01-Apr-2025 for conducting the conformity assessment of security requirements for Telecom equipment viz. AMF of 5G Download (pdf) (3145.01KB) pdf 01-04-2025
43 NCCS has designated M/s Nemko India (Test Lab) Pvt. Ltd. as Telecom Security Testing Laboratory(TSTL) in India w.e.f date 28-Mar-2025 for conducting the conformity assessment of security requirements for Telecom equipment viz. Wi-Fi CPE Download (pdf) (3154.09KB) pdf 28-03-2025
44 List of Optical Line terminal (OLT) protocols which are to be subjected to fuzz testing Download (pdf) (537.85KB) pdf 26-03-2025
45 List of Optical Network terminal (ONT) protocols which are to be subjected to fuzz testing Download (pdf) (527.67KB) pdf 26-03-2025
46 Security Certification of OLT and ONT-reg. Download (pdf) (607.90KB) pdf 25-03-2025
47 Last date for seeking stakeholder comments on "Draft for Comments ITSAR for L2 and (or) L3 LAN Switch" is extended to 31.03.2025 Download (pdf) (133.97KB) pdf 13-03-2025
48 Workshop on Essentials Of Telecom Security Testing- A Tools & Testers Perspective- Part 3 on 19-Mar-2025 Download (pdf) (155.95KB) pdf 12-03-2025
49 ITSAR for Firewall of Security Systems is published on 05-Mar-2025 Download (pdf) (558.90KB) pdf 07-03-2025
50 Notice seeking stakeholders inputs on DFC ITSAR for L2 and (or) L3 Switch Download (pdf) (134.74KB) pdf 21-02-2025
51 Vacancy circular for the posts of Lower Division Clerk-LDC and Telecom Assistant-TA Group C Posts in the O/o Sr. DDG, NCCS, Bengaluru on deputation basis Download (pdf) (2051.42KB) pdf 17-02-2025
52 Regarding Submission of Source code by OEMs and issue of Pro Tem Certificate under ComSec scheme. Download (pdf) (931.24KB) pdf 17-02-2025
53 Last date for seeking stakeholder comments on "Draft for Comments ITSAR document for Open RAN (O-RAN) of 5G: RIC" is further extended to 10.03.2025 Download (pdf) (174.85KB) pdf 14-02-2025
54 Last date for seeking stakeholder comments on "Draft for Comments ITSAR document for "Open RAN (O-RAN) of 5G: O-RU, O-DU, O-CU" is further extended to 15.02.2025 Download (pdf) (134.97KB) pdf 14-02-2025
55 Notice inviting stakeholder comments on "Draft for Comments ITSAR of Feedback Device" Download (pdf) (22.67KB) pdf 13-02-2025
56 Notice inviting stakeholder comments on "Draft for Comments ITSAR of Open RAN (O-RAN) of 5G: O-RU, O-DU, O-CU" Download (pdf) (134.97KB) pdf 13-02-2025
57 Notice inviting stakeholder comments on "Draft for Comments ITSAR of Open RAN (O-RAN) of 5G: RIC" Download (pdf) (175.32KB) pdf 13-02-2025
58 Notice inviting stakeholder comments on "Draft for Comments ITSAR of Vehicle Tracking Device" Download (pdf) (134.07KB) pdf 13-02-2025
59 Stakeholder meeting on 18.09.24 under chairmanship of Member(Services), DCC to discuss the issues related to security testing and certification under ComSec scheme Download (pdf) (417.81KB) pdf 13-02-2025
60 Notice for seeking stakeholder inputs on the DFC (Draft For Comment) of Indian Telecom Security Assurance Requirements (ITSAR) for Equipment Identity Register (EIR) of 5G Download (pdf) (60.19KB) pdf 13-02-2025
Total Items : 201